In order to allow my project to run smoothly I am creating a schedule to ensure dealines are met and the things that need to be done are done on time and properly. As our music video needs more time for editing rather than shooting it, we are going to leave a month for editing and shoot within the first week. The dates are as followed; Friday 21st January - Location recce Saturday 22nd & Sunday 23rd January - Filming
On the Saturday of the weekend, we proposed to film the shots that were similar such as smoking/dancing etc so we got it all done at one point. We chose to film over a weekend as then we would be able to capture all the footage in one go, enabling us more time to edit. In order for us to have a productive filming session we needed to create an equipment list so we had everything we needed, this included; Camera Camera mount (tripod) Tapes Lights Props - Make up, empty bottles, shot glasses, cigarettes, ashtray.
As well as preparing all these things, we made a call sheet so that if anything went wrong, we had all crew members telephone numbers and emails to contact them.
This is the call sheet below;
No comments:
Post a Comment